株式会社極東書店トップ > 商品一覧 > Online Scheduling in Manufacturing: A Cumulative Delay Approach. 2013 ed.
商品詳細
Online Scheduling in Manufacturing: A Cumulative Delay Approach. 2013 ed.
・ISBN 978-1-4471-5827-1 paper EUR 99.99
¥26,726.- (税込) ※(※)価格はご注文時の参考価格となります。
納品価格につきましては書籍の入荷時点で確定となります。
版元の原価改定、外国為替の変動等により異なる場合がございますので、予めご了承下さい。
| 著者・編者 | Suwa, Haruhiko / Sandoh, Hiroaki, |
|---|---|
| 出版社 | (Springer London Ltd, UK) |
| 出版年月 | 2014 |
| ページ数 | 158 pp. |
| 言語 | ENG |
| ニュース番号 | <A05-42223> |
解説
Online scheduling is recognized as the crucial decision-making process of production control at a phase of "being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets.
Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the practical decision-making:
1. To reduce frequent schedule revisions which do not necessarily improve a current situation with much expense for its operation;
2. To avoid overreacting to disturbances dependent on strongly an individual shop floor circumstance; and
3. To simplify the monitoring process of a schedule status.
Online Scheduling in Manufacturing will be of interest to both practitioners and researchers who work in planning and scheduling in manufacturing. Readers will find the importance of when-to-revise policies during a schedule execution and their influences on scheduling results.