株式会社極東書店トップ > 商品一覧 > Proceedings of the European Computing Conference: Volume 2. Softcover reprint of the original 1st ed. 2009
商品詳細
Proceedings of the European Computing Conference: Volume 2. Softcover reprint of the original 1st ed. 2009
・ISBN 978-1-4899-7924-7 paper EUR 199.99
¥53,456.- (税込) ※(※)価格はご注文時の参考価格となります。
納品価格につきましては書籍の入荷時点で確定となります。
版元の原価改定、外国為替の変動等により異なる場合がございますので、予めご了承下さい。
お気に入り
★★★
| 著者・編者 | Mastorakis, Nikos / Mladenov, Valeri / Kontargyri, Vassiliki T. (eds.), |
|---|---|
| シリーズ | (Lecture Notes in Electrical Engineering) |
| 出版社 | (Springer-Verlag New York Inc., US) |
| 出版年月 | 2016 |
| ページ数 | 729 pp. |
| 言語 | ENG |
| ニュース番号 | <A05-31269> |
解説
Software testing has been considered so important that organizations can assign teams only for testing activities. Testing is an important activity to ensure software quality. Tests are usually run several times to certify that code ma- tenance did not accidentally insert defects into working parts of the software. In such situations, test teams shall be able to estimate the required effort to execute test cases in its schedules and to request more resources or negotiate deadlines when necessary. When regarding model-based testing approaches that we use in our documented Integrated and Optimized Software Testing methodology (IOSTP) [1-4], a high number of test cases can be automatically generated. As team resources are limited, it may be not practical to execute all generated test cases. Their complexity usually determines the effort required to execute them and it can be used for planning test resources and test suites. Several software development estimation models have been proposed over the years. However, these models do not estimate the effort for executing a given test suite, since their estimations are based on software development complexity instead of its test planning, test case design and test execution complexity. According to our reading of the literature (e. g. [5-14]), ''best practices'' in model-based effort estimation include: Local calibration (or LC); i. e. using local data to set two special tuning parameters; Stratification; i. e. given a database of past projects, and a current project to be estimated, restrict local calibration to just those records from similar projects.